Skip to content

WORK ISLAND FOR ASSEMBLING COMPONENT “POWER TRAIN” FOR AUTOMOTIVE

Technical Sheet


Sector

Automotive

Product

Component “Power Train” for car

Components per model

Sizes

8 x 7 x 2,3 m

Layout

Assembly island consisting in 9 semiautomatic stations da 9 stazioni semiautomatiche located according to “O” shaped layout.

Main operations

Metering sealant with continuity check through vision system
Tightening 5 screws for fixing 2 subgroups
Pin insertion
Leak test
Check and adjustment of the coupling angle between the 2 subgroups
Tightening 5 screws
Insertion 2 E-rings
Minimum flow adjustment
Screwing 2 stud bolts
Marking datamatrix by laser system.
Each workstation, all the manual operations are objectified with poka-yoke systems. A supervisor system files all the process data and link them according to total traceability concept.


Photo Gallery

TELL US ABOUT YOUR PROJECT

You can also call us...
+39 0365 597759
... or write to us
samac@samac.it
Back To Top